Project Overview The project involved the demolition and removal of existing boiler attemperator piping and controls. The piping was replaced with 304 stainless steel piping and the controls were updated. Century A&E performed the field verification of existing piping, layout and design of the new piping and instrumentation. Century A&E prepared piping and instrument diagrams (P&IDs), demolition drawings for piping and instrumentation, plan and elevation piping drawings, hanger details, spool drawings for shop fabrication of the piping and wiring diagrams.
Services Provided Piping Design and Instrumentation & Controls |