Project Overview The project was designed to upgrade the glass processing equipment CIP loop to meet the requirements for the cleaning the piping and equipment involved in processing potential allergens. The CIP operation was upgraded to integrate with the existing CIP equipment PLCs. It included addition of new instrumentation and controls in order to document and validate the cleaning of the process loop. A functional description was created to incorporate the new controls into the existing PLC.
Century A&E performed the sizing and specification of the various equipment, pumps, valves, instrumentation and controls. Piping plan and elevation drawings along with wiring diagrams and one-line drawings were created along with bid documents for mechanical, electrical and integrator contractors.
Services Provided Chemical Process, Piping Design, Instrumentation & Controls, Electrical, Structural Engineering |
Clean-in-Place (CIP) Upgrade to Allergen Process Equipment |